1/5/18 – 9/5/18 – After waiting some time, the TMP has finally come through and the boys have been busy working late nights over the last week or so. Working with Hi-Class Glass we were able to safely remove all the old glass from the shopfront windows and canopy over the footpath. Once all our prep work was completed we were able to safely Hiab the steel canopy off the building to allow for the install of the scaffolding and site hoardings . Our next step will be to have the scaffold shrink wrapped for weather protection to then allow us to start removing the upper windows and facade.